Sir Charles Parsons School

Client:

Newcastle City Council

Construction Cost:

£2M


Project Details:

New swimming and hydrotherapy pool for pupils and for the local community.

Our Role:

Pool water treatment to PWTAG standards on all pools, site monitoring of installation and commissioning.


Design Team

Architects:

JDDK

Quantity Surveyor:

Todd Milburn Partnership

Structural Engineer:

BDN

M & E Engineers:

Armstrong Rhead

Pool/Spa Consultant:

Devin Consulting

the pool provides essential therapy for students 

Independent water treatment plants are provided for each pool.  This facilitates independent temperature control in each pool, but it also means that should one pool suffer from an accidental faecal release, then this pool can be attended to while the other pool remains in operation.

A dedicated water treatment plantroom is provided for the two pools, located adjacent to the poolside and with access direct to the outside.  Provision has been made for pool filter vessel removal when the project requires refurbishment.