Operating within extremely tight timescales, Devin specified the pool water treatment system at Villa Deportiva Nacional (VIDENA) along with the movable floor & boom, diving bubbler system, and the pool tanks using Revit 3D modelling.
The Videna Aquatic Centre is Lima’s first Olympic size pool and has a stainless steel tank which greatly contributed to the fast turnaround of this development which took just 70 weeks from start to finish. The aquatic centre includes a 50m x 10 lane competition pool, 50m x 10 lane warm-up pool with movable floor and boom, and a diving pool with bubbler system.
Client:
UK Delivery Team Pan Am Games
Completion:
2019
Project Manager:
Pattern Design Ltd
Architects:
Pattern Design Ltd
Main Contractor:
Cosappi
Pool Consultant:
Devin Consulting