Videna, Lima Peru

Share:
Videna Lima Peru Main Pool

Project details

A new aquatic centre for the Pan Am Games 2019 included two 50m pools and a diving pool.

Project role

Design and specifications of the pool tanks, diving bubbler feature, movable pool structures, and water treatment systems.

Operating within extremely tight timescales, Devin specified the pool water treatment system at Villa Deportiva Nacional (VIDENA) along with the movable floor & boom, diving bubbler system, and the pool tanks using Revit 3D modelling.

The Videna Aquatic Centre is Lima’s first Olympic size pool and has a stainless steel tank which greatly contributed to the fast turnaround of this development which took just 70 weeks from start to finish.  The aquatic centre includes a 50m x 10 lane competition pool, 50m x 10 lane warm-up pool with movable floor and boom, and a diving pool with bubbler system.

If you would like to learn more about what we can do for your next project, please visit our Services page.

  • Client:

    UK Delivery Team Pan Am Games

  • Completion:

    2019

  • Project Manager:

    Pattern Design Ltd

  • Architects:

    Pattern Design Ltd

  • Main Contractor:

    Cosappi

  • Pool Consultant:

    Devin Consulting