Westcroft Leisure Centre

Client:

London Borough of Sutton

Completion:

2013

Construction Cost:

£11.5M


Project Details:

25m x 17m competition pool to ASA standards, 20m x 10m warm up / teaching pool.

Our Role:

Design of the water treatment systems to full PWTAG compliance; site monitoring of installation and commissioning checks.


Design Team

Architects:

The HOCA Practice

Quantity Surveyor:

The HOCA Practice

Structural Engineer:

Elliott Wood

M & E Engineers:

Method Consulting LLP

Pool Consultant:

Devin

40 year old building refurbished to bring the pool water treatment systems up to date with PWTAG guideline requirements. Two independent water treatment plants are provided, one for the 25m pool and one for the warm up/teaching pool. Each system is complete with balance tank, VSD controlled circulation pumps, PAC flocculation, deep bed single grade sand media filtration, photo-oxidation using ultraviolet treatment, high efficiency plate heat exchangers, automated pH and residual chlorine disinfection control.