+44 (0)191 258 1653
 

King's College School, London

Client:

King's College School, London

Completion:

2019


Project Details:

A new sports complex for this leading independent day school includes a 25 metre, 6-lane swimming pool

Our Role:

Specialist advisory role during the design period; site monitoring of installation and commissioning


Design Team

Project Manager:

Synergy

Architects:

David Morley Architects

Main Contractor:

Knight Harwood

Structural Engineer:

Price Myers

M & E Engineers:

Max Fordham

Pool Consultant:

Devin Consulting

At King's College School, London the water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, heating, pH control and residual disinfectant control using chlorine.