+44 (0)191 258 1653
 

King's College School

Client:

King's College School

Completion:

2019


Project Details:

A new sports complex for this leading independent day school includes a 25 metre, 6-lane swimming pool

Our Role:

Specialist advisory role during the design period; site monitoring of installation and commissioning


Design Team

Project Manager:

Synergy

Architects:

David Morley Architects

Structural Engineer:

Price Myers

M & E Engineers:

Max Fordham

Pool Consultant:

Devin Consulting

The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, heating, pH control and residual disinfectant control using chlorine.