The Wave - Coventry

Client:

Coventry City Council

Completion:

Summer 2019

Construction Cost:

£36.7M


Project Details:

A new waterpark with 700m2 of leisure waters, 25m pool, health suite and gym.

Our Role:

Design and specification of the pool water treatment systems and water features; site monitoring of installation and commissioning works.


Design Team

Project Manager:

Hadron Consulting

Architects:

FaulknerBrowns

Quantity Surveyor:

Appleyards & Trew

Structural Engineer:

Engenuiti

Aquatic Consultants:

Devin Consulting

M & E Engineers:

Desco

the navigator & the speed slide

the waterpark has a total of nine slides including the Navigator - a waterpark version of a roller coaster which has both uphill and downhill drops, and the Speed Slide which has a thrilling drop of 20 metres.  The less adventurous may enjoy the lazy river and younger visitors will have fun in the splash pad zone with features and slides.  The city council was keen to ensure that the facility has easy access areas for people with mobility issues and is confident that this will be one of the most accessible water parks in the UK.  Facilities also include a 25m swimming pool, health suite for day spa visitors, 120 station fitness suite, dance studio, 25m pool and spinning studio.