+44 (0)191 258 1653
 

Butlin's Bognor Regis

Client:

Bourne Leisure

Completion:

April 2019

Construction Cost:

£40M


Project Details:

New pool to accommodate 950 guests at any one time. Seaside themed rides, wave pool, water features and lido.

Our Role:

Design and specification of the pool water treatment systems, pool features & slides hydraulics. Site monitoring of installation and commissioning.


Design Team

Project Manager:

Lavington's

Architects:

PWP Architects

Quantity Surveyor:

Lavington's

Aquatic Consultants:

Devin Consulting

world's first helter skelter water slide

The new pool can accommodate up to 950 guests at any one time and has been designed around a British seaside theme. Featuring the only Helter Skelter water slide in the world, users slide down before making a  splash into the plunge pool.  The Seaside Garden Rapids takes users on a journey with a choice of slides heading back to the main pool. The Stick of Rock Slide allows four bathers to race each other down the shutes to the rock archway below.  A Wave Pool operates regularly and quieter zones include a lido area for swimming with beach huts and sun loungers.