+44 (0)191 258 1653
 

Aberdeen Sports Village

Client:

Aberdeen City

Completion:

2014


Project Details:

50m x 10 lane training and competition pool with a dividing boom to allow the pool to be split into two distinct areas. 25m diving pool with full area floating floor and dive air cushion system

Our Role:

Design and specification of the pool water treatment and movable floor and boom; site monitoring of installation and commissioning.


Design Team

Architects:

FaulknerBrowns

Main Contractor:

Davis Langdon

Quantity Surveyor:

Gleeds

M & E Engineers:

Mott MacDonald

Pool Consultant:

Devin

Two independent water treatment plants are provided, one for each pool. Circulation within each pool takes account of the movable floor and the submersible boom, and the routing of all pipework is such that no pipework is buried underneath either of the 50m or diving pool tanks. The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine.