+44 (0)191 258 1653
 

Videna, Lima Peru

Client:

UK Delivery Team Pan Am Games

Completion:

2019


Project Details:

A new aquatic centre for the Pan Am Games 2019 included two 50m pools and a diving pool

Our Role:

Design and specifications of the pool tanks, diving bubbler feature, movable pool structures, and water treatment systems.


Design Team

Project Manager:

Pattern Design Ltd

Architects:

Pattern Design Ltd

Main Contractor:

Cosappi

Pool Consultant:

Devin Consulting

70 weeks from design to build

Operating within extremely tight timescales, Devin specified the pool water treatment system, movable floor & boom, diving bubbler system, and the pool tanks using Revit 3D modelling. 

The Videna Aquatic Centre is Lima’s first Olympic size pool and has a stainless steel tank which greatly contributed to the fast turnaround of this development which took just 70 weeks from start to finish.  The aquatic centre includes a 50m x 10 lane competition pool, 50m x 10 lane warm-up pool with movable floor and boom, and a diving pool with bubbler system.