UK Delivery Team Pan Am Games
2019
A new aquatic centre for the Pan Am Games 2019 included two 50m pools and a diving pool
Design and specifications of the pool tanks, diving bubbler feature, movable pool structures, and water treatment systems.
Pattern Design Ltd
Pattern Design Ltd
Cosappi
Devin Consulting
Operating within extremely tight timescales, Devin specified the pool water treatment system at Villa Deportiva Nacional (VIDENA) along with the movable floor & boom, diving bubbler system, and the pool tanks using Revit 3D modelling.
The Videna Aquatic Centre is Lima’s first Olympic size pool and has a stainless steel tank which greatly contributed to the fast turnaround of this development which took just 70 weeks from start to finish. The aquatic centre includes a 50m x 10 lane competition pool, 50m x 10 lane warm-up pool with movable floor and boom, and a diving pool with bubbler system.