University of Surrey
2010
£27m
A 50m x 21m pool with a movable floor and traversable boom.
Design of the water treatment, movable floor and traversable boom; site monitoring of installation and commissioning.
FaulknerBrowns
SKM Anthony Hunt
Hoare Lea
Devin Consulting
At University of Surrey the brief for the movable floor – to move 25m in 15 minutes or less – was achieved by careful considerations to the boom perforations, elevation and opening end gates.
The water treatment plant was designed to provide an excellent water quality, for high level competitive swimming.