+44 (0)191 258 1653
 

Braywick Leisure Centre

16 October 2020

It's no mean feat to build a brand new leisure centre, but to do so and open during the current climate with all the COVID-19 restrictions is a huge achievement.  Visitors are kept safe with a strict entry timetable system to manage the number of users and whilst it may be a little while before families can enjoy the leisure pool with slide and interactive play features, the main 25m x 10 lane pool is open for lane swimming.

Devin was very pleased to be working with our valued clients Wates (main contractor) and Hoare Lea (MEPH) on this project to design and specify the pool water treatment systems and interactive water features.