Select Property Group / Arcadis / Sir Robert McAlpine
2021
New build aparthotel in the upcoming Embankment West neighbourhood in Manchester. The building includes a communal spa with 18m x 5m lap pool and spa pool with water and air massage features. The spa also includes a poolside steam room.
Design and specification of the pool tanks, pool water treatment system, water features and heat experience cabin; site monitoring of installation and commissioning.
Arcadis
Callison RTKL-UK
Curtins
Ridge
Devin Consulting Ltd
CitySuites II in Manchester has two independent water treatment plants, one for each pool. The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine. The spa pool incorporates water and air massage features activated on demand by the bather.