The Life Centre Plymouth Life

Client:

Plymouth City

Completion:

2013

Construction Cost:

£28M


Project Details:

50m x 25m competition pool with two movable floors and two submersible booms, 25m x 15.5m diving pool, with full movable floor and diving pool air cushion system, 180m² leisure waters and bubble pool.

Our Role:

Water treatment on all pools to PWTAG standards, movable floors, submersible booms and diving pool air cushion system.


Design Team

Architects:

Archial

Structural Engineer:

ARUP

M & E Engineers:

ARUP

Pool Consultant:

Devin

Four independent water treatment plants are provided for each pool; 50m, diving, leisure, and bubble pool. Circulation within each main pool takes account of the movable floors and the submersible booms. All pipework has been routed so that none is buried underneath either of the 50m or diving pool tanks. This is an important design consideration should remedial works ever be required on the distribution pipework.

 