The Hurlingham Club

Client:

The Hurlingham Club

Completion:

2011


Project Details:

30.5m x 12.25m main competition pool and a children’s pool, incorporating paddling and swimming zones.

Our Role:

Design of the water treatment, pool cover and water feature systems; site monitoring of installation and commissioning.


Design Team

Architects:

David Morley

Structural Engineer:

Scott White and Hookins

M & E Engineers:

Hoare Lea

Pool Consultant:

Devin

The aesthetics of the pools, the features and the water are a key part of the architectural language of the project. Water quality for bathing is to the highest standards. The treatment systems are housed in a centralised below ground water treatment plantroom.

The water treatment system incorporates PAC flocculation, medium rate filtration on single grade sand beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine.