+44 (0)191 258 1653
 

Sun Lane Leisure Centre, Wakefield

Client:

Wakefield District Council

Completion:

2012

Construction Cost:

£10M


Project Details:

25m pool, 25m x 12.5m x usable depth of 0m to 1.8m, complete with 25m x 6.25m longitudinal movable floor with 3.5m ramp and a disabled access platform and self-depositing steps; learner pool, 13m x 7m x usable depth of 0 to 1.8m, complete with full area movable floor.

Our Role:

Design of the water treatment systems; movable floor and disabled access platform; site monitoring of installation and commissioning.


Design Team

Architects:

NPS North East

Main Contractor:

Willmott Dixon

Quantity Surveyor:

NPS North East

M & E Engineers:

NPS North East

Pool Consultant:

Devin

Two independent water treatment plants are provided. Circulation within each pool takes account of the movable floors and the disabled access platform.

The water treatment system incorporates PAC flocculation, medium rate filtration on recycled glass beds, photo-oxidation using ultraviolet, heating, pH control and residual disinfectant control using chlorine. VSDs control pump flows.