Dubai Aquatic Centre

Client:

Dubai Municipality

Completion:

2010

Construction Cost:

£100M


Project Details:

50m x 25m pool, diving pool and a 50m x 21m multipurpose pool incorporating 2 submersible booms and 1 submersible floor.

Our Role:

Water treatment on all pools, moveable floor and submersible booms and diving pool air cushion systems.


Design Team

Architects:

FaulknerBrowns

Quantity Surveyor:

David Langdon

Structural Engineer:

Arup

M & E Engineers:

Arup

Pool Consultant:

Devin

Three independent water treatment plants are provided, one for each of the two 50m swimming pools and one for the diving pool. In addition a fourth water treatment plant is provided for the divers' warm pool.

The water treatment systems on all pools incorporate circulation to take account of all submersible booms and movable floors.