+44 (0)191 258 1653
 

ashington leisure centre

Client:

Northumberland County Council

Completion:

2015

Construction Cost:

£16M


Project Details:

Leisure Centre with a 25m pool & teaching pool, and spa facilities.

Our Role:

Design and specification of the pool water treatment systems, spa pool features, and movable floor & boom. Specification of the heat experience cabins & features. Site monitoring of installation and commissioning


Design Team

Project Manager:

Arch

Architects:

Ryder Architecture

Quantity Surveyor:

Hall & Partners

Structural Engineer:

WSP Group

M & E Engineers:

Balfour Beatty

Pool/Spa Consultant:

Devin

stunning new facility for northumberland

The leisure centre includes a 25m swimming pool with movable floor & submersible boom to provide utmost flexibility of use, there is also a separate learner pool.  The health suite includes a spa pool with air & water massage features, sauna & steam rooms, aromatherapy room, ice bowl feature, experience showers, heated foot spas and heated relaxation bench. The water treatment systems design incorporated PAC flocculation, medium rate filtration on sand media beds, phot-oxidation using ultraviolet for excellent water quality, pH control using carbon dioxide for the 25m and studio pools, and low strength hydrochloric acid for the spa pool, and residual disinfection control using chlorine.